47
1.2 Manufacturer
The scaffold described in this document is manufactured by:
KRAUSE-Werk GmbH & Co. KG
Am Kreuzweg 3
D 36304 Alsfeld
Telefon: 06631 / 795-0
Telefax: 06631 / 795-139
www.krause-systems.com
1.3 Applicable standards, type approval
The mobile aluminium scaffold of the ProTec System series conforms to
EN 1004. The scaffold has been approved by TUEV PRODUKT SERVICE
(type approval).
1.4 Warranty
The warranty terms and conditions are included in the sales and delivery terms of the
supplier. Material defects are covered for 5 years from the date of purchase of the affec-
ted part by the manufacturer‘s warranty. The manufacturer retains the right to replace or
repair the defective part at its own choice.
The warranty is based on the installation and user manual valid on the day of purchase
of the product. Not covered by warranty are damages caused by any of the following:
– Ignorance of or non-compliance with the instructions in the installation and user ma-
nual, and in particular with the safety instructions, instructions on proper and impro-
per use, maintenance and care instructions,
– Use of the product by not qualified or insufficiently instructed personnel of the ope-
rator.
– Use of spare and/or accessory parts from suppliers other than Krause.
– Use of damaged or defective component parts.
– Extension of the working height by the use of ladders, boxes and other devices.
1.5 Copyright and other property rights
The manufacturer reserves all rights in the installation and user manual. Reproduction
of this document, in whole or in part, is only permitted with the explicit consent of the
manufacturer. The manufacturer retains all rights in patents and registrations of design.
Breach of this clause shall result in legal action for compensation!
Summary of Contents for ProTec XS
Page 2: ...2 DE FaltGer st ProTec XS 3 GB Folding scaffold ProTec XS 45...
Page 29: ...29 Die Abbildung zeigt das fertig montierte Ger st mit einer Arbeitsh he von 5 80 m...
Page 53: ...53 Identification The type plate above is attached to the vertical frames of the ProTec system...
Page 70: ...70 Fully mounted scaffold with a working height of 5 80 m...
Page 86: ...86 Notice...
Page 87: ...87 Notice...