55
Assembly
Insert the screws through the joint
pieces of the vertical frame sections
and place the large washers over the
screws. Insert the bushing through
the boreholes of the folding frame as
shown in the picture to the left.
Bushing
Screw with washer
Lock nut an
small washer
Larger washer
Screw
Pull the screw slightly back and place
the folding section between the two
joint pieces attached to the vertical
frame.
Push the screws through the bushings.
Secure the folding section by tightening
the lock nuts with the small washers.
Tools required: size 13 wrench;
tightening torque: 20 Nm.
Summary of Contents for ProTec XS
Page 2: ...2 DE FaltGer st ProTec XS 3 GB Folding scaffold ProTec XS 45...
Page 29: ...29 Die Abbildung zeigt das fertig montierte Ger st mit einer Arbeitsh he von 5 80 m...
Page 53: ...53 Identification The type plate above is attached to the vertical frames of the ProTec system...
Page 70: ...70 Fully mounted scaffold with a working height of 5 80 m...
Page 86: ...86 Notice...
Page 87: ...87 Notice...