52
SAFETY INSTRUCTIONS
CAUTION
Ensure that the brakes of the castors are always applied, except when you wish to
move the scaffold.
All plug-type
connections
must be secured
with gravity pins.
All rail braces and
diagonal braces as
well as platforms
must be secured
with the safety set
Castor brake
released
6
1
2
Castor brake
applied
5
Tip for erection
Attach safety sets to the rail braces, diagonal braces and platforms before you erect
the scaffold!
4
3
Safety Set
Prod. No. 718914,
M 5 x 65 mm
Prod. No. 718853,
M 5 x 95 mm
Safety Set
Platform
Summary of Contents for ProTec XS
Page 2: ...2 DE FaltGer st ProTec XS 3 GB Folding scaffold ProTec XS 45...
Page 29: ...29 Die Abbildung zeigt das fertig montierte Ger st mit einer Arbeitsh he von 5 80 m...
Page 53: ...53 Identification The type plate above is attached to the vertical frames of the ProTec system...
Page 70: ...70 Fully mounted scaffold with a working height of 5 80 m...
Page 86: ...86 Notice...
Page 87: ...87 Notice...