1.4 MOUNTING BRACKET (FA 20 706 00) –
KS9000 only
This bracket is used to affix the rail system to the receiving structure (concrete wall or metal surface) - see Fig. 4. The receiving structure must be drilled
so that the mounting bracket can be affixed with 16 mm fastenings.
This gives the rail greater stability.
Fastenings: 1 Hex Head Bolt (provided).
weight : 1,16 kg.
Material: 316 stainless steel
Tools needed: 17 mm spanner wrench.
Installation : Install two mounting brackets per rail.
•
The mounting bracket (FA 20 706 00) can be installed on different receiving structures (metal, concrete, etc.) with specific fasteners.
•
Chemical fixation must be used to install the mounting bracket on concrete (not provided).
•
For metal structures, stainless steel fasteners must be used (not provided).
•
The shorter end of the mounting bracket is affixed to the rail with a fastening nut (see §1.1). The longer end is affixed to the receiving structure
with a suitable fastener (Fig. 4).
1.5 RUNG CLAMP (FA 20 705 00) –
KS8000 only
The aluminium rail is installed directly onto the rungs of a ladder using mounting accessories.
The rung clamp helps hold the aluminium rail against the ladder rungs.
Weight: 1.16 kg
Material: 316 stainless steel
Tools needed: 17 mm spanner wrench.
Installation: Install two rung clamps per rail.
•
Insert the T screws into the aluminium rail and slide them to the point where the counterplate will be mounted.
•
Make sure that the first counterplate is about 30 cm from the lower edge of the rail.
•
Place the T screws on each side of the rung.
•
Behind the rung, place the counterplate with separator on the T screws (Fig. 5).
•
Screw the bolts in so that the counterplate is firmly positioned against the rung.
•
The aluminium rail is now affixed to the rung. Repeat this process every 1.50 m.
Tightening torque: max.42 N/m.
Fig. 5
Structure Side
Rail side
Hex Head Bolt
1: Counterplate
2: M10 T-head bolt (x2)
3: Threaded rod (x2)
2+3: T Screw (x2)
4: Nyloc M10 nut (x2)
5: Separator Plate