1. Place control board in firebox, aligning holes in board to
holes in firebox bottom. MAKE SURE SEALING GASKET
IS IN PLACE ON FIREBOX BOTTOM! Secure control
board to firebox bottom with (7) screws previously removed.
2. Reinstall halogen bulbs.
3. Reinstall burner assembly by positioning over burner orifice
and aligning mounting holes at sides of burner tube over tabs
on control board. Secure to firebox back wall with screw
previously removed
4. Reinstall fireglass. Page 20.
5. Reconnect gas line to manual shut-off valve.
6. Reconnect all wiring harnesses to gas valve. Plug all compo-
nents into electrical outlet.
7. Reinstall glass frame assembly. Page 11.
8. Turn gas on.
9. Reinstall contemporary frame. Page 20.
10. Verify proper log placement, operation of fireplace, and any
electrical components.
WARNING: DO NOT OPERATE THIS FIREPLACE WITHOUT SEALING GASKET (LOCATED UNDER CONTROL BOARD) IN
PLACE. IF GASKETING IS DAMAGED, IT MUST BE REPLACED.
CAUTION: CHECK ALL CONNECTIONS FOR LEAKS,
WHETHER FIELD OR FACTORY MADE.
IPI BOARD INSTALLATION
PAGE 23
BURNER ORIFICE
PILOT ASSEMBLY
Summary of Contents for Nicollet NCL-195
Page 43: ...PAGE 42...
Page 44: ...PAGE 43...