IT
COLLEGAMENTI VAPORE
(solo vers. EASY - TOP)
Per i modelli “TOP” ed “EASY” è necessario effettuare (o controllare
se già eseguiti dal Costruttore) i seguenti collegamenti:
Collegamento
n°
Caldaia
Uscita vapore
8
Rubinetteria
Elettrovalvola di carico
9
Elettrovalvola di scarico
Raccordo sifone piatto
10
GB
STEAM CONNECTIONS
(only version EASY - TOP)
For models “TOP” and “EASY” it is necessary to make the following
connections, or to check whether they have already been made
by the manufacturer:
Connection
no.
Boiler
Steam outlet
8
Tap fixtures
Filling solenoid
9
Discharge solenoid
Tray siphon connection
10
D
DAMPFANSCHLÜSSE
(nur Ausf. EASY - TOP)
Für die Modelle “TOP” und “EASY” müssen folgende Anschlüsse (oder
prüfen, ob bereits werkseitig vorgenommen) ausgeführt werden:
Anschluss
Stck.
Kessel
Dampfaustritt
8
Armatur
Magnetventil Befüllung
9
Magnetventil Entleerung
Anschlussstutzen Siphon Duschtasse
10
FR
RACCORDS À LA VAPEUR
(uniquement vers. EASY - TOP)
Pour les modèles “TOP” et “EASY”, il faut effectuer les branche-
ments suivants (ou contrôler si déjà effectués par le fabricant):
Branchement
n°
Chaudière
Sortie vapeur
8
Robinetterie
Électrovanne de remplissage
9
Électrovanne de vidange
Raccord siphon receveur
10
ES
CONEXIONES DE VAPOR
(sólo vers. EASY - TOP)
Para los modelos “TOP” e “EASY” es necesario efectuar (o
comprobar, si ya las ha realizado el fabricante) las siguientes
conexiones:
Conexión
n°
Caldera
Salida de vapor
8
Grifería
Electroválvula de llenado
9
Electroválvula de desagüe
Empalme con el sifón del plato
10
PT
LIGAÇÕES VAPOR
(somente vers. EASY - TOP)
Para os modelos “TOP” e “EASY” é necessário efectuar (ou contro-
lar se já foi executado pelo Fabricante) as ligações a seguir:
Ligação
n°
Caldeira
Saída vapor
8
Torneiras
Electroválvula de carga
9
Electroválvula de descarga
Conexão sifão base
10
Summary of Contents for Box Atollo freestanding
Page 18: ...18 1 Fase Phase Montageschritt BASE EASY TOP 2 3 1 A EASY TOP BASE A2 A1 A1 5 4 A2 A1...
Page 20: ...20 2 1 A 4 3 B 2 4x M6x60 2x M6x40 OK 3 BASE EASY TOP Fase Phase Montageschritt...
Page 22: ...22 3 BASE EASY TOP Fase Phase Montageschritt A B OK NO C B C 2 2 B 3 2x M6x40 C 4 OK 1...
Page 26: ...26 4b D C C 1 D 3x M5x20 2 3x M5x20 3 Fase Phase Montageschritt BASE EASY TOP...
Page 28: ...28 4c 4 4 2 2 2 4 3 S N Q D5 D2 D1 1 S P Q P P Q Fase Phase Montageschritt BASE EASY TOP...
Page 30: ...30 4d 2 1 D3 D8 D7 D7 4 D3 D7 OK 3 3 4 Fase Phase Montageschritt BASE EASY TOP...
Page 32: ...32 4e D6 D4 D4 D7 D7 4x TCEI M4x25 1 2 R Fase Phase Montageschritt BASE EASY TOP...
Page 34: ...34 5 BASE EASY TOP Fase Phase Montageschritt A E E6 2 E E1 E4 E2 1 E3 E1 E D4 D4 A...
Page 36: ...36 6 BASE EASY TOP Fase Phase Montageschritt 1 E4 E1 E1 E3 E2 E1 E3 2 3 E5 E7 E6 E5...
Page 38: ...38 7 BASE EASY TOP Fase Phase Montageschritt 1 2 2x M6x40 3 2x M6x60 C 4...
Page 40: ...40 8 BASE EASY TOP Fase Phase Montageschritt 1 2 M B M 1 4 M12 3 4...
Page 42: ...42 9a 5 4 3 1 2 4 5 3 1 5 2 6 6 7 Fase Phase Montageschritt BASE S...
Page 44: ...44 9a 2 3 4 2 5 1 2 4 5 3 1 6 7 6 Fase Phase Montageschritt BASE D...
Page 46: ...46 9b 5 4 3 5 2 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 6 8 Fase Phase Montageschritt EASY S TOP S...
Page 48: ...48 9b 2 3 4 2 5 6 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 7 Fase Phase Montageschritt EASY D TOP D...
Page 50: ...50 1 11 9c Fase Phase Montageschritt 8 8 9 9 10 Fase Phase Montageschritt EASY TOP...
Page 62: ...62 13 Fase Phase Montageschritt BASE EASY TOP 17 17...
Page 64: ...64 14 BASE EASY TOP Fase Phase Montageschritt 743 1042 150 150 483 1 3 2 N mm...
Page 66: ...66 15 Fase Phase Montageschritt 3 1 2 4 5 BASE EASY TOP...
Page 68: ...68 16 BASE EASY TOP Fase Phase Montageschritt 1 4x M6x20...
Page 70: ...70 17 BASE EASY TOP Fase Phase Montageschritt G H B C H L...
Page 72: ...72...
Page 73: ...73...
Page 74: ......