![KOS Box Atollo freestanding Assembling Instruction Download Page 4](http://html1.mh-extra.com/html/kos/box-atollo-freestanding/box-atollo-freestanding_assembling-instruction_1999117004.webp)
4
325
400
475
1700
1400
B
A
C
650
200
D
[mm]
[mm]
IT
GB
D
FR
ES
PT
325
400
475
1700
1400
B
A
C
200
650
D
D
S
A. Uscita acqua calda 3/4”F
B. Uscita acqua fredda 3/4”F
Pressione min 150KPa
Pressione max 500KPa
C. Alimentazione elettrica
(vedi note)
D. Scarico a filo pavimento Ø40 mm.
A. Hot water outlet 3/4”F
B. Cold water outlet 3/4”F
Min. pressure 150 KPa
Max. pressure 500 KPa
C. Power supply
(see note)
D. Drain at floor level Ø40 mm.
A. Auslass kaltwasser 3/4“F
B. Auslass warmwasser 3/4“F
Mindestdruck 150 kPa
Höchstdruck 500 kPa
C. Stromversorgung
(siehe hinweis)
D. Ablass auf fussbodenniveau Ø40 mm.
A. Sortie eau chaude 3/4”F
B. Sortie eau froide 3/4”F
Pression max. 150 KPa
Pression min. 500 KPa
C. Alimentation électrique
(voir note)
D. Trou d'évacuation au ras du sol Ø40 mm
A. Salida agua caliente 3/4”F
B. Salida agua fría 3/4”F
Presión mínima 150 kPa
Presión máxima 500 kPa
C. Alimentación eléctrica
(véase nota)
D. Desagüe a ras pavimento Ø40 mm.
A. Saída água quente 3/4”F
B. Saída água fria 3/4”F
Pressão min 150 KPa
Pressão max 500 KPa
C. Alimentação eléctrica
(veja notas)
D. Descarga a fio pavimento Ø40 mm.
IT
Collegamenti
GB
Connections
DE
Verbindungen
FR
Connexions
ES
Conexionados
PT
Conexões
Summary of Contents for Box Atollo freestanding
Page 18: ...18 1 Fase Phase Montageschritt BASE EASY TOP 2 3 1 A EASY TOP BASE A2 A1 A1 5 4 A2 A1...
Page 20: ...20 2 1 A 4 3 B 2 4x M6x60 2x M6x40 OK 3 BASE EASY TOP Fase Phase Montageschritt...
Page 22: ...22 3 BASE EASY TOP Fase Phase Montageschritt A B OK NO C B C 2 2 B 3 2x M6x40 C 4 OK 1...
Page 26: ...26 4b D C C 1 D 3x M5x20 2 3x M5x20 3 Fase Phase Montageschritt BASE EASY TOP...
Page 28: ...28 4c 4 4 2 2 2 4 3 S N Q D5 D2 D1 1 S P Q P P Q Fase Phase Montageschritt BASE EASY TOP...
Page 30: ...30 4d 2 1 D3 D8 D7 D7 4 D3 D7 OK 3 3 4 Fase Phase Montageschritt BASE EASY TOP...
Page 32: ...32 4e D6 D4 D4 D7 D7 4x TCEI M4x25 1 2 R Fase Phase Montageschritt BASE EASY TOP...
Page 34: ...34 5 BASE EASY TOP Fase Phase Montageschritt A E E6 2 E E1 E4 E2 1 E3 E1 E D4 D4 A...
Page 36: ...36 6 BASE EASY TOP Fase Phase Montageschritt 1 E4 E1 E1 E3 E2 E1 E3 2 3 E5 E7 E6 E5...
Page 38: ...38 7 BASE EASY TOP Fase Phase Montageschritt 1 2 2x M6x40 3 2x M6x60 C 4...
Page 40: ...40 8 BASE EASY TOP Fase Phase Montageschritt 1 2 M B M 1 4 M12 3 4...
Page 42: ...42 9a 5 4 3 1 2 4 5 3 1 5 2 6 6 7 Fase Phase Montageschritt BASE S...
Page 44: ...44 9a 2 3 4 2 5 1 2 4 5 3 1 6 7 6 Fase Phase Montageschritt BASE D...
Page 46: ...46 9b 5 4 3 5 2 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 6 8 Fase Phase Montageschritt EASY S TOP S...
Page 48: ...48 9b 2 3 4 2 5 6 2 4 5 3 1 7 1 7 2 7 3 7 4 7 5 6 7 Fase Phase Montageschritt EASY D TOP D...
Page 50: ...50 1 11 9c Fase Phase Montageschritt 8 8 9 9 10 Fase Phase Montageschritt EASY TOP...
Page 62: ...62 13 Fase Phase Montageschritt BASE EASY TOP 17 17...
Page 64: ...64 14 BASE EASY TOP Fase Phase Montageschritt 743 1042 150 150 483 1 3 2 N mm...
Page 66: ...66 15 Fase Phase Montageschritt 3 1 2 4 5 BASE EASY TOP...
Page 68: ...68 16 BASE EASY TOP Fase Phase Montageschritt 1 4x M6x20...
Page 70: ...70 17 BASE EASY TOP Fase Phase Montageschritt G H B C H L...
Page 72: ...72...
Page 73: ...73...
Page 74: ......