4 - OPERATING INSTRUCTIONS
4 - OPERATING INSTRUCTIONS
###_4_###
Commissioning the unit
Commissioning operation
The implement is provided on pallet with:
• The right-hand side rotor and left-hand side rotor as-
sembled.
• The support wheel assembled.
• The outer rotor raised.
• The outer guard elements bundled.
• The Power Take-Off (PTO) shaft and outer support
wheels loose.
• The hardware in a plastic bag.
The tedder is completely assembled except the frame with
warning panels and the tine arms. You can find the loose
parts and the plastic bag with hardware wired to either the
pallet or machine in a space saving way.
ZEIL18HT00749AA
1
Z455H
ZEIL18HT00765AA
2
Z555H
Raise the implement on a smooth surface with a fork lifter
with long forks.
ZEIL17HT00137AA
3
4-1
Summary of Contents for Z 455 H
Page 16: ...1 GENERAL INFORMATION 1 12...
Page 32: ...2 SAFETY INFORMATION ZEIL18HT00950FA 1 811650220 2 Part number 1650220 2 16...
Page 38: ...3 CONTROLS AND INSTRUMENTS 3 2...
Page 52: ...4 OPERATING INSTRUCTIONS 4 14...
Page 78: ...8 TROUBLESHOOTING 8 2...
Page 80: ...9 SPECIFICATIONS 9 2...
Page 84: ...10 ACCESSORIES 10 4...
Page 88: ...11 FORMS AND DECLARATIONS 11 4...
Page 91: ......