CHECK EVERY 100 HOURS SERVICE - see MAINTENANCE SECTION
LUBRICATING
1.
Boom cylinder foot pins (2 places)
2.
Boom foot pin (2 places)
3.
Boom cylinder rod end pin (2 places)
4.
Arm cylinder foot pin (1 place)
5.
Boom-Arm connection pin (1 place)
6.
Arm cylinder rod end (1 place)
7.
Bucket cylinder foot pin (1 place)
EVERY 50 HOURS SERVICE
LUBRICATING (MANUAL GREASE SYSTEM)
NOTICE
For the first 100 hours on new machines where the parts are setting in, carry out greasing every 10
hours.
1.
Set the work equipment in the greasing posture below, then lower the work equipment to the ground and
stop the engine.
2.
Using the grease pump, pump in grease through the grease fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed out.
KS001269
1
2
3, 4, 5
ATTACHMENTS AND OPTIONS
SUPER LONG FRONT BOOM AND ARM
6-29
Summary of Contents for PC210-11
Page 2: ......
Page 24: ......
Page 74: ......
Page 352: ......
Page 431: ...SPECIFICATIONS 5 1 ...
Page 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Page 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Page 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Page 505: ...REPLACEMENT PARTS 7 1 ...
Page 521: ......