PROCEDURES FOR LOADING MACHINE
Load on a firm and level ground.
Maintain a safe distance from the road shoulder
1.
Apply the brake of the trailer securely.
2.
Set chocks (1) to the wheels to secure the trailer.
3.
Set right and left ramps (2) parallel to each other and
equally spaced to the right and left of centre (3) of the trail-
er. Make angle of installation (4) a maximum of 15 °.
If the ramps bend a large amount under the weight of the
machine, put blocks under the ramps to prevent them from
bending.
4.
Push travel speed selector switch (5) to set the travel
speed to low (Lo lights up).
The travel speed (Lo, Mi, Hi) is displayed on travel speed
display (6).
5.
Turn auto-deceleration switch (7) OFF and operate the fuel
control dial to set the engine to low speed.
Each time auto-deceleration switch (7) is pressed, it
switches OFF to ON to OFF in turn.
When auto-deceleration switch (7) is turned OFF, the auto-
deceleration pilot lamp (8) goes out.
6.
Turn the swing lock switch ON to apply the swing lock.
When the swing lock switch is turned to ON position, swing
lock pilot lamp (9) lights up.
(a): ON position
(b): OFF position
OPERATION
TRANSPORTATION
3-245
Summary of Contents for PC210-11
Page 2: ......
Page 24: ......
Page 74: ......
Page 352: ......
Page 431: ...SPECIFICATIONS 5 1 ...
Page 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Page 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Page 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Page 505: ...REPLACEMENT PARTS 7 1 ...
Page 521: ......