![Komatsu D375A-8 Operation & Maintenance Manual Download Page 432](http://html1.mh-extra.com/html/komatsu/d375a-8/d375a-8_operation-and-maintenance-manual_1991126432.webp)
(3) Blade arm ball joint (1 place)
(4) Brace screw (1 place)
(5) Ripper tilt cylinder rod end pin (one place each at right
and left)
(6) Ripper lift cylinder rod end pin (one place each at right
and left)
(7) Ripper arm pin (rear) (one place each at right and left)
(8) Ripper tilt cylinder bottom pin (2 places)
(9) Ripper lift cylinder bottom pin (2 places)
(10) Ripper arm pin (front) (2 places)
The sketch on the right shows the giant ripper (option).
(11) Suspension (equalizer bar side shaft) (2 places)
(12) Suspension (equalizer bar center shaft) (1 place)
4.
Perform greasing of the suspension (equalizer bar center
shaft) through the grease fittings marked by arrows.
5.
Pump the greasing lever up and down 3 to 5 times.
6.
After greasing, wipe off any old grease that is pushed out.
MACHINE WITH MINING SPECIFICATION
ATTACHMENTS AND OPTIONS
6-36
Summary of Contents for D375A-8
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 13: ...Scale interval of the circles is 1 m FOREWORD INTRODUCTION 1 11...
Page 310: ......
Page 394: ......
Page 395: ...SPECIFICATIONS 5 1...
Page 448: ......
Page 449: ...REPLACEMENT PARTS 7 1...
Page 465: ......