At the Basic tap, enter the information for the project, change the storage path, builder, location,
project date, operator and something else, then click Next button to the next parameter
configuration.
Fig.3-32 Basic info
At Coord tap, if there are no the local coordinate system in the list, click New button to create the
local coordinate system.
Fig.3-33 Coordinate system