Key Operator Instructions
7E6174 – 16FEB01
5 –19
1. Release the 2 Latches. Gently pull out the Processor until it locks in place, to
avoid splashing, and check that the Racks are in the correct position.
2. Push the Processor back into the Multiloader.
3. Carefully push the Processor back into the Multiloader until the Latches click into
position.
Warning
See Step 9 on 4 –11.
4. Connect the Multiloader main power (either the mains plug, grasp the mains plug
only, or move the wall-mounted main switch to the "1" position.
5. Move the Circuit Breakers (Loader and Processor) on the back of the Multiloader
to the "1" position.
Important
Check that the Drains are closed.
6. Turn on the Processor.
Important
The Replenisher Pumps automatically start when the Processor is turned on.
7. Wait for the Multiloader Main Menu to appear on the Display Panel, then press
PROC.
H186_1086GC
Processor
Latch
H186_1086GCA
Latch
Summary of Contents for X-OMAT 7000
Page 4: ...4 16FEB01 7E6700...
Page 6: ...6 16FEB01 7E6174...
Page 20: ...Introduction 1 14 16FEB01 7E6174...
Page 32: ...Quick Reference Operating Instructions 2 12 16FEB01 7E6174...
Page 48: ...Overview 3 16 16FEB01 7E6174...