![KLOCKNER BK-DH 500 SERIES Operating Manual Download Page 38](http://html1.mh-extra.com/html/klockner/bk-dh-500-series/bk-dh-500-series_operating-manual_1978916038.webp)
Operating manual 17.410+411
Pos.: 20
Dateiname
Firma
Datum
Rev
BK-DH 700 x 1000 eng.doc
BRUKS-KLÖCKNER
27.02.09
00
Seite 38 von
61
8
INSPECTION AND MAINTENANCE
8.1
General comments
•
Every person concerned with installation, start-up, operation and mainte-
nance of the chipper must have read and understood the complete man-
ual, in particular the section „safety instructions“. The user is advised to
have this confirmed by signature of the appropriate personnel.
•
Regular maintenance must only be performed with switched off (locked
out) motors.
•
Prior to commencing any work on the machine it must be locked out ac-
cording to the appropriate rules and regulations.
•
Any bolted connection that was loosened in the course of maintenance
work must be checked after eight hours running time.
•
Due to the strong vibrations during operation, all bolted connections
must be regularly checked and tightened if required.
•
Any bolts and nuts that become unusable must be replaced with the
same type and grade.
•
Due to widely varying operating conditions of chippers, it cannot be pre-
dicted how often regular checks and maintenance will be required. The
user must establish those intervals with due consideration to operating
conditions prevailing at the user's operation.