Installation procedure:
5.2
Set-up and preliminary alignment
Drum chipper is placed on foundation or support and aligned with the anchor or hold
down bolts.
Level drum chipper. To level drum chipper longitudinally place machinist’s level on
foot of chipper. To level drum chipper laterally use machinist’s level across belt
sheave or on side of crowned flat belt sheaves.
Levelling is done by means of the levelling screws in the base of the machine. If re-
quired the base is to be shimmed with large shims
Do not
tighten down the machine after this preliminary alignment.
5.3
Installation of hydraulic plant
The hydraulic unit is connected to the piping on the machine by means of the sup-
plied hoses. (See enclosed hydraulic diagram). The plugs in the fittings of the ma-
chine and power pack must be removed.
The hoses are ready for installation, the union must be tightened by turning the nut
one half turn after the point of noticeable turning force increase is reached, while
holding the fitting with a wrench.
This work is to be performed cleanly, so that absolutely no dirt or other foreign parti-
cle enters the hydraulic circuit.
The hydraulic tank is filled at the factory. The oil level must be checked by means of
the sight glass and to the upper marker if oil level is too low.
Oil used at the factory: SHELL Tellus 46.
For
topping up only
this type of oil is to be used. When changing oil, any other oil
with similar properties can be used. (see maintenance - lubrication schedule).
The hydraulic powerpack can be fixed to the concrete cinch anchors, sized according
to the size of the mounting holes on the unit. If the machine is installed on a steel