![KLOCKNER BK-DH 500 SERIES Operating Manual Download Page 27](http://html1.mh-extra.com/html/klockner/bk-dh-500-series/bk-dh-500-series_operating-manual_1978916027.webp)
Operating manual 17.410+411
Pos.: 20
Dateiname
Firma
Datum
Rev
BK-DH 700 x 1000 eng.doc
BRUKS-KLÖCKNER
27.02.09
00
Seite 27 von
61
5.8
Installation of motor and base
Bolt slide rails to base and install motor. Place assembly on foundation and line up so
that both sheaves are in line. This can be checked with a straight edge or string
which must touch each sheave in two points without being bent.
Fig.:
line up of sheaves
Riem2.cdr
Before final tightening of anchor bolts the motor (or motor base) is to be moved over
the whole length of rails, while checking the alignment of sheaves in different posi-
tions.
It is very important that this line up is accurate and without twist; the motor (or motor
base) must rest equally on all rails.
5.9
Installation of drive belt(s) and guard
Prior to installation, the grooves of V-belt sheaves or surface of flat belts pulleys must
be cleaned carefully and any oil, grease or corrosion protection must be removed.