INSTALLATION
5.1
General comments
We recommend that the installation be performed or supervised by
personnel of
BRUKS-KLÖCKNER
.
We cannot be responsible for damages caused through improper installation.
Every person concerned with installation, start-up, operation and maintenance
of the chipper must have read and understood the complete manual, in particu-
lar the section "safety instructions". The user is advised to have this confirmed
by signature of the appropriate personnel.
The drum chipper can be mounted on a concrete foundation or a solid steel structure.
The design of the supporting structure is to be done by qualified persons according to
the loads in the enclosed general arrangement drawings.
In the vicinity of the machine sufficient space is to be provided for the operation,
maintenance and repair works.
If the chipper is installed at other than ground level, it may be desirable to install ac-
cess platforms.
A general arrangement drawing containing all necessary information concerning di-
mensions, loads and weights is enclosed. Installation is to be performed according to
this drawing.