6
-
2
dk4210(c)hse / dk4710(c)hse / dk5310(c)hse / dk6010(c)hse
1. place implement on the level
ground.
2. drive the tractor backward to move
as close as possible to an imple-
ment (Approx. 5 cm). then, adjust
the height of the lower link to be par-
allel to the pins of the implement.
3. place the shift levers in the neutral
position, stop the engine and apply
the parking brake.
(1) implement support (2) implement pin
(1) check link
(2) turn buckle
4. lengthen the chain by turning the
check link turn buckle.
5. first install the left lower link to the
implement pin and insert lynch pin
into the hole and turn the ring to
hold implement pin securely.
6. install the right lower link to the
implement pin and insert lynch pin
into the hole and turn the ring to
hold implement pin securely.
(1) turn buckle
(2) lift rod (rh)
(3) lower link
(4) implement pin
(5) lynch pin
h61o608b
h61o615A
REMOvAL AND INsTALLATION Of 3-POINT HITCH IMPLEMENT
(INCLuDINg CONNECTION Of uNIvERsAL jOINT)
111
22
d21o601A
TD210-미국법인향-DK4210,4710,5310,6012 2
2018-03-30 오후 6:41:25
Summary of Contents for DK4210(C)HSE
Page 42: ...MEMO memo TD210 DK4210 4710 5310 6016 6 2019 09 18 4 09 19...
Page 152: ...MEMO MEMO TD210 DK4210 4710 5310 60118 18 2018 03 30 6 41 40...
Page 196: ...MEMO memo TD210 DK4210 4710 5310 60144 44 2019 09 18 4 53 51...
Page 207: ...10 10 INDEX INDEX 10 2 TD210 DK4210 4710 5310 6011 1 2019 10 11 10 59 37...
Page 214: ...7 TD210 DK4210 4710 5310 6018 8 2019 10 11 10 59 38...