56
6
-
3
3-point hitch implement And loAder operAtion
7. install the top link to the top link
hole of the implement. loosen the
lock nuts of top link and turn the
top link handle to adjust the length
of it as needed. Align the pin holes
for top link and top link hole on the
implement to insert the set pin.
insert the snap pin into the set pin
hole securely to hold the set pin.
(1) top link
(2) top link bracket
(3) snap pin
(4) top link hook
(1) implement support
8. raise up the implement by posi-
tion control of tractor. remove the
implement support as needed.
Align the implement by adjusting
the length of the check chains on
both sides. tighten the lock nuts
on the check chain securely.
9. Adjust the tip angle of implement by
adjusting the length of top link. tight-
en the top link lock nuts securely.
10. Adjust the balance of implement
by adjusting the length of lift rod
(rh). tighten the turn buckle
lock nut of lift rod (rh) securely
afterward.
h61o608A
h61o616A-2
TD210-미국법인향-DK4210,4710,5310,6013 3
2018-03-30 오후 6:41:25
Summary of Contents for DK4210(C)HSE
Page 42: ...MEMO memo TD210 DK4210 4710 5310 6016 6 2019 09 18 4 09 19...
Page 152: ...MEMO MEMO TD210 DK4210 4710 5310 60118 18 2018 03 30 6 41 40...
Page 196: ...MEMO memo TD210 DK4210 4710 5310 60144 44 2019 09 18 4 53 51...
Page 207: ...10 10 INDEX INDEX 10 2 TD210 DK4210 4710 5310 6011 1 2019 10 11 10 59 37...
Page 214: ...7 TD210 DK4210 4710 5310 6018 8 2019 10 11 10 59 38...