Basic Finishing 5: Tile Border Behind S2PF Surround (3/4” Maximum Total Thickness)
Step One:
Frame Fireplace with nailing tabs oriented as
shown.
Step Two:
Use Non-Combustible Header Strip on top
frame of fireplace and Drywall to finish face of wall.
NOTE:
Drywall will be flush with fireplace face.
Step 3:
A tile, brick, or other non-combustible border may
be applied over fireplace face to conceal border.
IMPORTANT NOTE!:
If installing tile, brick, or other non-
combustible material around the perimeter of the surround:
you MUST Leave 1” of the face exposed around the fireplace
opening on the Bottom and Sides, and 1-3/16” exposed on the
top. This is to install and remove the surround. See drawings
below.
A Tile Lip Kit (ZCV-TLK) is available.
Nailing Tab
Non-Combustible Header Strip
1-3/16” MIN
Fireplace
Opening
Drywall
1
” M
IN
Fireplace Frame
Drywall
Tile
Tile
Tile
S2PF Surround
Required
Clearance
S2PF
Surround
Fireplace
Opening
20
Summary of Contents for MCVST42LP
Page 17: ...Fireplace Opening Required Clearance S1PF Surround 17...
Page 22: ...22...
Page 55: ...Gas Conversion for Modulator PART C 55...
Page 60: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 60...
Page 61: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 61...
Page 68: ...Proflame 2 Remote Control 68...
Page 70: ...70...