MCVST42
Framing Dimensions
These structures are not load bearing.
NOTE: Framing depth shown (23-1/16”)
will leave face of fireplace ½” proud of framing
on both sides. Adjust framing to desired depth based on finishing requirements. Refer
to
Nailing Tab Guide
section also.
Optional floor cutout for gas line if coming up
through floor.
TOP VIEW
*For Propane Horizontal installations the venting must be an additional one foot
above the minimum vertical rise off the flue before going horizontal.
Framed fireplace opening.
58-1/2”
MIN
for NG
70-1/2”
MIN
for LP
Plus Rise of ¼”
Per Foot*
Vertical Venting MUST maintain 1” clearance to combustibles.
BOTTOM OF FIREPLACE
58-1/2”
MIN for NG
70-1/2”
MIN for LP
Plus Rise of ¼” Per Foot*
Z58WTS Must be used in
enclosures below 73”.
Vent Framing (Vertical or Horizontal)
9” Round Hole
through Masonry.
12” x 12” Framing
for Combustible.
51-3/8
”
51-3/8
”
13
Summary of Contents for MCVST42LP
Page 17: ...Fireplace Opening Required Clearance S1PF Surround 17...
Page 22: ...22...
Page 55: ...Gas Conversion for Modulator PART C 55...
Page 60: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 60...
Page 61: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 61...
Page 68: ...Proflame 2 Remote Control 68...
Page 70: ...70...