Product Installation Manual

 

 

for

 

ensuring that all bolts in tightening state (reference torque 12 ~ 15n.m). 

  

电池架示意图

 

    Battery rack schematic diagram 

 

 

 

 

 

 

 

 

 

  

安装步骤

 

    Installation step 

第一步

 The First step 

先取电池架两个侧面平放在地上,取横档,两端用横档螺栓

M8X60

M8X40

在侧面框架上固定

(

先不拧紧

)

 

Firstly, the two sides of the battery rack are laid flat on the ground, and take 
rail.

 

Both ends are fixed on the side frame with crosspiece bolts M8X60 or 

M8X40 (do not tighten first). 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

侧面框架

 

Side Frame 

地脚螺栓

 

Foundation Bolt

:M8X70 or 

M12X80 

下层横档螺栓

 

Rail Bolt

:M8X60 

or

 M8X40 

档条

Bar B 

横档

 

Rail 

上层横档螺栓

 

Rail Bolt

:M8X100 

档条

B

螺栓

 

Bar B Bolt

:M8X16 

横档

 

Rail 

侧面框架

 

Side Frame 

下层横档螺栓

 

Rail Bolt

:M8X60 

or

 M8X40 

Summary of Contents for KLV2V100024VRCK

Page 1: ...Product Installation Manual...

Page 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Page 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Page 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Page 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Page 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Page 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Page 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Page 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Page 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Page 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Page 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Page 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...

Reviews: