第十步

 The Tenth step 

如有线盒,参照接线图上的位置,根据接线盒安装示意图,把

(

1/

2)

线盒安装在侧面框架上的档条

A

及立柱上。

 

If there is a junction box,

 

refer to the location on the wiring diagram.

 

According 

to the schematic diagram of junction box installation,

 

install the junction box

1/2 

Appendix

on the side frame on the Bar A and the upright post. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

       

第十一步

 The Eleventh step 

电池组所有连接线及配件安装完毕后,使用万用表测量电池组电路是否
连通,电压是否正常,确认无误后正式接线通电使用,电池组安装完
毕。

 

After all the connecting wires and accessories of the battery pack are 
installed, use a multimeter to measure whether the battery circuit is connected 
and whether the voltage is normal? After confirming that there is no mistake, 
the formal wiring shall be electrified for use. And the

 

installation of battery 

pack is finished. 

 

结束

 

End

 

 

 
 
 
 
 

电池

 

Battery 

接线盒

 

Junction box 

Summary of Contents for KLV2V100024VRCK

Page 1: ...Product Installation Manual...

Page 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Page 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Page 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Page 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Page 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Page 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Page 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Page 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Page 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Page 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Page 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Page 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...