background image

                                             

 

Product Installation Manual

 

 

产品安装手册

 

Product Installation Manual 

  

安装注意事项

 

    Installation precautions 

1  

准备工作

 

1    Prepare work 

1) 

工具:

14

17mm 

开口扳手或活动扳手

把;

14mm 

套筒扳手

把。

 

注意:所有电池出厂前已荷电,所有金属安装工具使用前必须用绝缘胶
带包裹,进行绝缘处理,防止电池短路。

 

1)

 

Tools:14~17mm

 

Open-ended wrench or adjustable wrench 2 pcs; 

14mm socket wrench 1 pcs. 

Note:

 

All batteries were charged before leaving the factory. All metal 

installation tools must be wrapped with insulating tape before use,

 

perform 

insulation treatment,

 

prevent short circuit of battery. 

2)

 

安装时注意电池间间隙,建议≈

10mm(

或按图纸要求

)

,保证较好的

散热条件。

 

2)

 

Pay attention to the clearance between batteries during installation,

 

suggest ≈10mm (or as required by drawings),

 

ensure better heat 

dissipation conditions. 

2  

安装步骤

 

2    Installation step 

1

)安装人员进行电池架的开箱检查及配件的清点,配件箱中装箱清

单、电池安装示意图、安装使用说明书等文件应收好,待安装工程
结束后交由客户公司相关部门负责保管。

 

1)

 Installation personnel shall conduct unpacking inspection of battery racks 

and inventory of accessories,

 

documents such as packing list, battery 

installation schematic diagram, installation and operation instructions in the 
accessory box shall be properly collected. After the installation project is 
completed,

 

the relevant departments of the customer company shall be 

responsible for the custody. 

2

)按照施工图纸检查电池在机房的摆放位置是否合理,是否预留了维

护空间,如果不符合,应先请示用户是否修改,修改后需要有备忘录。

 

2

)

 

According to the construction drawings, check whether the placement of 

batteries in the machine room is reasonable

 

and whether maintenance space 

is reserved? If not,

 

please check with the user first if you can modify it, and a 

memorandum is required after the revision. 

3

)安装连接条前应保证极柱上的灰尘已擦干净。安装后要逐个检查所

有连接螺栓是否拧紧。要指定专人检查,专人负责,确保所有螺栓处于

 

拧紧状态(参考扭矩

12

15N.m

)。

 

3)

 

Before installing the connecting strip, ensure that the dust on the pole has 

been wiped clean.

 

After installation, check whether all connecting bolts are 

tightened one by one?

 

To designate a person to check, a person responsible 

Summary of Contents for KLV2V100024VRCK

Page 1: ...Product Installation Manual...

Page 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Page 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Page 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Page 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Page 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Page 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Page 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Page 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Page 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Page 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Page 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Page 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...