background image

                                             

 

Product Installation Manual

 

 

如图

1

所示:

 

As shown in the figure 1 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

2

:接线盒样式

2

安装说明

 

Appendix 2: Installation Instructions 

for Junction Box Style 2 

6

、现将接线盒取出,将安装底板用

2

M8X25

螺栓固定在电池架的档条

A

的安装孔上

(M8

螺栓朝上

)

 

6

 

Now  take  out  the  junction  box,  and  fix  the  mounting  base  plate  on  the 
mounting hole of the battery rack Bar A with 2 pcs M8X25 bolts (M8 bolts 
face up); 
 

7

、将

M8

螺母拧下,把电池端引出的输出线铜鼻子套在

M8

螺杆上,然后拧

紧螺母

(

含弹垫、平垫

)

 

7

 

Unscrew the M8 nut, fit the copper nose of the output wire from the battery 
end onto the M8 screw, and then tighten the nut (including elastic cushion 
and flat cushion); 

8

、将下端

M10

螺栓及螺母拧下,与客户设备相连的输出线的一端用

M10

栓及螺母紧固在铜排上面;

 

8

 

Unscrew the M10 bolt and nut at the lower end, and fasten one end of the 

护罩

 

Shield 

M10X25 

护罩支撑板

 

Shield support plate 

连接铜排

 

Connection copper bar 

高压磁瓶

 

High-voltage magnetic bottle 

连接板

 

Connecting plate 

 

M5X25 

M8X25 

M12X35 

M10X20 

Summary of Contents for KLV2V100024VRCK

Page 1: ...Product Installation Manual...

Page 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Page 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Page 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Page 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Page 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Page 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Page 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Page 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Page 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Page 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Page 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Page 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...

Reviews: