第四步

 The Fourth step 

用卷尺对角校测架子的四角,确保架子垂直平稳、不歪斜,再把横档、
档条

B

与侧面框架的连接螺栓紧固;

 

Measure the four corners of the rack diagonally with a tape measure,

 

make 

sure that the rack is vertical, stable and not skewed.

 

Then tighten the 

connecting bolts of Rail, Bar B and Side frame. 

 

第五步

 The Fifth step 

将方通架移至指定的摆放区,定好位,用钻头在

4

个地脚孔位打上记

号,把架移开,用冲击钻在记号处从地面垂直钻孔深

55mm

,用于准备安

装地脚螺栓;

 

Move the square frame to the designated placing area,

 

set a good position. 

Mark the 4 anchor holes with a drill bit and move the frame away.

 

Use 

percussion drill to drill a hole 55mm deep vertically from the ground at the 
mark for preparing to install foundation bolts. 

       

 

第六步

 The Sixth step 

电池架安装好后,放在已确定的安装位置,安装地脚螺栓。

 

After the battery rack is installed, place it in the determined installation 
position and install the foundation bolts. 

1

)螺母

 

Nut

    

2

)弹垫

  Elastic cushion

   

3

)平垫

 

Flat cushion

 

4

)膨胀管

 

Expansion pipe

     

5

M8

膨胀螺栓

 

M8 expansion bolt   

6

)水泥地面

 

Cement floor 

 

安装膨胀螺栓操作步骤

 

Operating Steps for Installing Expansion Bolt 

步骤

 1 

用冲击钻在膨胀螺栓的安装孔位上打孔,打孔深度在

52mm 

60mm 

之间

(

膨胀螺栓

M8X70)

 

Step 1 Punch holes in the mounting holes of expansion bolts with percussion 
drills, and the drilling depth is between 52mm and 60mm (expansion bolt 
M8X70) 

 

步骤

 2 

将膨胀螺栓略微拧紧,垂直放入孔中。用橡胶锤敲打膨胀螺栓

直至膨胀管全部进入孔内。

 

Step 2 Tighten the expansion bolt slightly and place it vertically into the hole.

 

Beat the expansion bolt with a rubber hammer until all expansion pipes enter 
the holes. 

 

步骤

 3 

预拧紧膨胀螺栓。

 

Step 3 Pre-tighten expansion bolts 

 

步骤

 4 

拧出螺栓,取下平垫和弹垫。

 

Step 4 Unscrew the bolts and remove the flat cushion and elastic cushion 

Summary of Contents for KLV2V100024VRCK

Page 1: ...Product Installation Manual...

Page 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Page 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Page 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Page 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Page 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Page 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Page 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Page 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Page 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Page 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Page 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Page 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...

Reviews: