Tutorial
Output-on Phase Control (SEQuence 2: SYNChronize,
PCR-M only)
On the PCR-LE, use the output subsystem commands to control the output ON/OFF phase.
Do not use sequences.
PCR-M/PCR-LE has five different trigger subsystems -TRANsient, SYNChronize, ACQuire,
SIMulation, and PROGram. These features are mapped to SEQuence1 to SEQuence5
respectively, as the SCPI specification generally categorizes each trigger subsystem as a
numbered Trigger Sequence.
The SEQuence2 (SYNChronize) group is the output ON phase control trigger subsystem.
Using TRIGger:SEQuence2 (or TRIGger:SYNChronize) subsystem allows you to synchronize
the output ON/OFF changes with a specific AC output phase angle.
TRIGger:SEQuence2:SOURce PHASe
'Configures the PCR so that the phase will
be controlled when the output is turned on
'Sets the phase angle at 270 deg
When the power supply output is changed from OFF to ON state, the changing action is
synchronized to the specified phase angle.
To disable the output-on phase control, set the trigger source to IMMediate.
TRIGger:SEQuence2:SOURce IMMediate
The output-on phase control is applied only when the output is changed from OFF to ON. It
is not applied when the output changes from ON to OFF or when other settings such as the
AC voltage setting, DC voltage setting, and frequency setting change.
The output-on phase control is not a function that synchronizes the output frequency to the
input commercial AC line.
The sequence 2 group does not have INITiate commands. It is always initiated and cannot
be aborted.
Introduction
Installing the VISA library
Interface Setup
Overview of Command
Parameters
Default settings
Command (function
search)
IEEE488.2 Common Commands
Output Setting
Protection and Clearing Alarms
Triggered Control of Output
Output On/Off Phase Control
Measured Value Queries
System Configuration
Registers
Command (ABC search)
Command (Sub-system
search)
SOURce
OUTPut
MEASure and FETCh
TRIGger
SYSTem
STATus
IEEE488.2 Common Commands
Other Commands
List(PDF)
Register
Architecture
Register structure
Appendix
A List of Errors
Processing time of main
Tutorial
Programming AC Output
Programming DC Output
Triggering Output Change
Output-on Phase Control
Measurement
Waiting for Operation Complete
Panel display
Status Monitoring
Error Checking
Visual Basic 2008
AC Power Supply PCR-M series
Communication Interface Manual
PCR-M series Communication Interface Manual
KIKUSUI ELECTRONICS CORP.
61/166