Waiting for Operation Complete
The *OPC command has a capability to wait for an operation to complete. Operation
complete means that there is no pending operation that is still in progress. It takes
approximately 330 ms on the PCR-M and approximately 110 ms on the PCR-LE/PCR-LE2 for
a measurement to be completed. The PCR is not in the operation complete state while a
measurement is ongoing. When the measurement completes, if there are no other
operations waiting to be completed, the PCR enters the operation complete state.
When the *OPC command is sent, the PCR-M/ PCR-LE/PCR-LE2 enters the Operation
Complete Command Active State (OCAS). When the measurement is completed and there is
no other operation pending, the PCR-M/ PCR-LE/PCR-LE2 returns to Operation Complete
Command Idle State (OCIS) and sets the OPC bit (bit 0) to TRUE (1) in the Standard Event
Status Register. This information can be confirmed with the *ESR? query command by
checking the OPC bit (bit 0).
The following example makes a new measurement and sends the *OPC. When the
measurement is completed, an SRQ (Service Request) is generated, as the Standard Event
Status Enable Register and the Service Request Enable Register are unmasked so that an
SRQ can be signaled by the Operation Complete event. When using the RS232 interface, the
SRQ feature cannot be used.
*ESE 1;*SRE 32;*CLS;:INITiate:IMMediate:SEQuence3;*OPC
<Wait for the SRQ to be generated.>
Using the *OPC? query command instead of the *OPC command makes the PCR-M/ PCR-
LE/PCR-LE2 enter the Operation Complete Query Active State (OQAS). When the
measurement is completed and there is no other operation pending, the PCR-M/ PCR-
LE/PCR-LE20 returns to the Operation Complete Query Idle State (OQIS) and sets the
response data to "1" (in NR1 format ) in the output queue.
INITiate:IMMediate:SEQuence3;*OPC?
<Read the response>
At power-on or after the IEEE488 sdc/dcl, *RST command is sent, the PCR-M/ PCR-LE/PCR-
LE2 is in the OCIS and OQIS state
Introduction
Installing the VISA library
Interface Setup
Overview of Command
Parameters
Default settings
Command (function
search)
IEEE488.2 Common Commands
Output Setting
Protection and Clearing Alarms
Triggered Control of Output
Output On/Off Phase Control
Measured Value Queries
System Configuration
Registers
Command (ABC search)
Command (Sub-system
search)
SOURce
OUTPut
MEASure and FETCh
TRIGger
SYSTem
STATus
IEEE488.2 Common Commands
Other Commands
List(PDF)
Register
Architecture
Register structure
Appendix
A List of Errors
Processing time of main
Tutorial
Programming AC Output
Programming DC Output
Triggering Output Change
Output-on Phase Control
Measurement
Waiting for Operation Complete
Panel display
Status Monitoring
Error Checking
Visual Basic 2008
AC Power Supply PCR-M series
Communication Interface Manual
PCR-M series Communication Interface Manual
KIKUSUI ELECTRONICS CORP.
65/166