5-14 Parallel and Series Operation
PAS SERIES
OVP (overvoltage protection) setting
OCP (overcurrent protection) setting
Set the value equal to the current to be protected divided by the num-
ber of units connected in parallel for OCP.
5.2.5 Master-slave parallel Operation Procedure
• When turning on the POWER switch, be sure to turn on the
master unit first.
When turning off the POWER switch, be sure to turn on the
slave units first. If you don’t keep the procedure, erroneous
operation may result.
When you are done with the steps described in "5.2.4 Master-Slave
Parallel Operation Setup" normal operations are performed on the
master unit.
NOTE
Summary of Contents for PAS 10-105
Page 10: ...VIII PAS SERIES This page has been intentionally left blank ...
Page 54: ...3 22 Basic Operation PAS SERIES This page has been intentionally left blank ...
Page 78: ...4 24 Remote Control PAS SERIES This page has been intentionally left blank ...
Page 131: ...PAS SERIES Specifications 8 13 This page has been intentionally left blank ...
Page 137: ...PAS SERIES Specifications 8 19 This page has been intentionally left blank ...
Page 145: ......