5-4 Parallel and Series Operation
PAS SERIES
5.1.2 J1 Connector Connection (Series Operation)
For master-slave series operation, two units are connected as shown
in Fig.5-2.
The maximum output voltage during master-slave series operation is
twice the rated output voltage of a single unit.
Connecting the signal wires (series operation)
The connector needed to connect the J1 connector is not provided.
For detail, see "4.1.1 About the J1 Connector" .
• The J1 connector contains pins that are at the same
electric potential as the output terminal. If you are not
using the J1 connector, to prevent the possibility of
electric shock, be sure to insert the protective socket
provided.
• To prevent the possibility of electric shock, be sure to
use the protective cover on the sockets.
Connection procedure
1.
Decide the power supply that is to be the master unit.
2.
Connect the J1 connectors on the rear panel as shown in
Fig.5-2.
Fig.5-2 Connection for series operation
WARNING
J1
1
25 23
17
20
21
Master unit
J1
1
3
13 11
10
2
Slave unit
Master unit
Slave unit
SER OUT
+
23
SER OUT−
25
ALM STATUS
20
STATUS COM
17
OUTON STATUS 21
11 SER
IN
+
13 SER
IN−
10 SHUT
DOWN
2 D COM
3 OUT ON/OFF CON
Summary of Contents for PAS 10-105
Page 10: ...VIII PAS SERIES This page has been intentionally left blank ...
Page 54: ...3 22 Basic Operation PAS SERIES This page has been intentionally left blank ...
Page 78: ...4 24 Remote Control PAS SERIES This page has been intentionally left blank ...
Page 131: ...PAS SERIES Specifications 8 13 This page has been intentionally left blank ...
Page 137: ...PAS SERIES Specifications 8 19 This page has been intentionally left blank ...
Page 145: ......