Safety Precautions III
Installation
• When installing products be sure to observe “Installation” described in this man-
ual.
• To avoid electrical shock, connect the protective ground terminal to electrical
ground (safety ground).
• When connecting the power cable to a switchboard, be sure work is performed by
a quali
fi
ed and licensed electrician or is conducted under the direction of such a
person.
• When installing products with casters, be sure to lock the casters.
Relocation
• Turn off the power switch and then disconnect all cables when relocating the
product.
• Use two or more persons when relocating the product which weights more than
20 kg. The weight of the products can be found on the rear panel of the product
and/or in this operation manual.
• Use extra precautions such as using more people when relocating into or out of
present locations including inclines or steps. Also handle carefully when relocat-
ing tall products as they can fall over easily.
• Be sure the operation manual be included when the product is relocated.
Operation
• Check that the AC input voltage setting and the fuse rating are satis
fi
ed and that
there is no abnormality on the surface of the power cable. Be sure to unplug the
power cable or stop applying power before checking.
• If any abnormality or failure is detected in the products, stop using it immediately.
Unplug the power cable or disconnect the power cable from the switchboard. Be
careful not to allow the product to be used before it is completely repaired.
• For output wiring or load cables, use connection cables with larger current capac-
ity.
• Do not disassemble or modify the product. If it must be modi
fi
ed, contact Kikusui
distributor/agent.
Maintenance and checking
• To avoid electrical shock, be absolutely sure to unplug the power cable or stop
applying power before performing maintenance or checking.
• Do not remove the cover when performing maintenance or checking.
• To maintain performance and safe operation of the product, it is recommended
that periodic maintenance, checking, cleaning, and calibration be performed.
Service
• Internal service is to be done by Kikusui service engineers. If the product must be
adjusted or repaired, contact Kikusui distributor/agent.
Check?
Summary of Contents for OT01-PCR12000LA/2
Page 10: ...VIII Contents OT01 PCR LA 2 ...
Page 16: ...1 6 General OT01 PCR LA 2 ...
Page 44: ...2 28 Installation and Preparation for Use OT01 PCR LA 2 ...
Page 56: ...4 8 Part Names and Functions OT01 PCR LA 2 ...
Page 64: ...5 8 Single phase Parallel Operation OT01 PCR LA 2 ...
Page 82: ...6 18 Single phase Three wire Operation OT01 PCR LA 2 ...
Page 94: ...1 2 Index OT01 PCR LA 2 ...
Page 95: ......
Page 96: ...OUTPUT EXPANSION KIT OT01 PCR LA 2 OPERATION MANUAL ...