2-24 Installation and Preparation for Use
OT01-PCR-LA/2
2.7
Operation Check
This section describes the operation check to be performed in single-phase parallel
operation and single-phase, three-wire operation. If you are conducting an operation
check for the
fi
rst time, be sure to
fi
rst gain an understanding of the operation proce-
dure of the PCR-LA power supply.
2.7.1
Single-phase Parallel Operation
In single-phase parallel operation, the control panel display differs from that when a
PCR-LA power supply is operated singly.
Operation procedure
■
Operation of the Output Terminal
1.
Turn the SYSTEM POWER switch OFF.
The WIRING switch can be operated only when the SYSTEM POWER switch
is OFF.
2.
Press the WIRING switch’s 1P button.
The 1P lamp lights up. The 1P lamp also lights up when the power is turned
ON.
3.
Turn the SYSTEM POWER switch ON.
■
Operation of the PCR-LA power supplies
4.
Check the master- and slave-unit control panel displays.
Master unit’s display
The master-unit control panel displays the same indications as when a PCR-
LA power supply is operated singly. The ammeter indicates the total output
current value of the master and slave units.
Slave units’ displays
A parallel operation address 1 appears in the frequency display area of each
control panel.
Follow the operation check procedure for a PCR-LA power supply.
For more information on this, see the PCR-LA AC Power Supply Operation
Manual.
Summary of Contents for OT01-PCR12000LA/2
Page 10: ...VIII Contents OT01 PCR LA 2 ...
Page 16: ...1 6 General OT01 PCR LA 2 ...
Page 44: ...2 28 Installation and Preparation for Use OT01 PCR LA 2 ...
Page 56: ...4 8 Part Names and Functions OT01 PCR LA 2 ...
Page 64: ...5 8 Single phase Parallel Operation OT01 PCR LA 2 ...
Page 82: ...6 18 Single phase Three wire Operation OT01 PCR LA 2 ...
Page 94: ...1 2 Index OT01 PCR LA 2 ...
Page 95: ......
Page 96: ...OUTPUT EXPANSION KIT OT01 PCR LA 2 OPERATION MANUAL ...