Post-Fire Operation
After a Kidde IGS discharge, qualified fire suppression system maintenance personnel must
perform post-fire maintenance as directed in Chapter 7 of this manual. Observe all warnings,
especially those pertaining to the length of elapsed time before entering the hazard area.
5-3
MAIN AND RESERVE SYSTEMS
After operating the “main” system as described above, place the “reserve” system in standby
mode as follows:
1. Reset all manually operated release units, pressure operated trips, discharge indicators,
manual operation stations, and pressure operated switches. Ensure that the control panel
and all detectors are reset.
2. If the system uses selector valves, reset solenoids on the valve.
3. Proceed to the main/reserve transfer switch. Set the transfer switch to the RESERVE posi-
tion.
4. Immediately contact a Kidde distributor for service.
5-4
CYLINDER RECHARGE
Recharge all Kidde IGS cylinders immediately after use. Return all cylinders to a Kidde
Distributor or other qualified refill agency. Refill in accordance with the procedures outlined in
Chapter 6 of this manual.
WARNING
Do not enter a hazard area with an open flame or lighted smoking materials.
Flammable vapours may cause reignition or explosion. Ensure the fire is
completely extinguished before ventilating the area. Ventilate the area
thoroughly before permitting anyone to enter the hazard area, or use a self-
contained breathing apparatus.
WARNING
The following procedures can be applied only when the reserve system has not
been previously discharged.
Summary of Contents for 400 Series
Page 2: ...Table i Revision History Revision Change Description AA Initial Release ...
Page 16: ...July 2018 xiv 06 237518 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 157: ...06 237518 001 A 1 July 2018 APPENDIX A SAFETY DATA SHEETS ...
Page 188: ...July 2018 A 2 06 237518 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 189: ......