July 2018
x
06-237518-001
TABLE OF CONTENTS (CONT.)
Inspection Procedures-2 Year ................................................................. 6-7
Blow Out Distribution Piping ................................................................... 6-7
Hydrostatic Test of Cylinders .................................................................. 6-8
Discharge Cylinders or Charged Cylinders that are Transported ................... 6-8
Removing a Kidde IGS System Cylinder ................................................... 6-10
Reinstalling a Kidde IGS Cylinder ............................................................ 6-10
CHAPTER 7 POST-DISCHARGE MAINTENANCE
After System Discharge ......................................................................... 7-1
Cylinder Replacement............................................................................ 7-1
Cylinder/Valve Replacement ................................................................... 7-2
Re-Installing Release Units..................................................................... 7-3
Re-Installing Slave Cylinder Gauge Assemblies ......................................... 7-4
Recharging Kidde IGS System Cylinders................................................... 7-4
Agent and Cylinder Part Number ............................................................. 8-2
Slave Cylinder Gauge Assemblies ............................................................ 8-3
Listed 360 Degree Nozzles ..................................................................... 8-7
Listed 180 Degree Nozzles ..................................................................... 8-10
Summary of Contents for 400 Series
Page 2: ...Table i Revision History Revision Change Description AA Initial Release ...
Page 16: ...July 2018 xiv 06 237518 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 157: ...06 237518 001 A 1 July 2018 APPENDIX A SAFETY DATA SHEETS ...
Page 188: ...July 2018 A 2 06 237518 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 189: ......