4 Install Hardware
S9106AC-2IF, -4UP, and -42D 5G FR1 Multi-port Transceiver Solutions, Startup Guide
49
Item
Qty
Connection To... From...
RF loop-back cable with adapters (not included w/ S9106AC-42D)
Used during verification only; connect RF loop-back cable and adapters from
RF Out
➀
to RF In
➁
on Transceiver 1 and then on 2, 3, and 4. This same loop-
back cable with adapters can be moved to verify the High IF ports on Transceiver 1
and 2 as well as the HD ports; see
RF loop-back cable with adapters (or equivalent) can be used:
5063-1530 RF Cable, SMA (m) to SMA (m), 152.4 mm (6.0 in)
with two 1250-1250 Adapters, SMA (f) to Type-N (m)
4. 4. 1 Connect Cables, LAN Cables, a Display, a Keyboard & Mouse
1. Connect cables as shown in the equipment setup above.
2. Connect LAN 1 (top) to the Site LAN at your facility.
3. Connect LAN 2 (bottom) to the E7770A CIU CONTROL
➅
(rear panel).
4. Connect a Display, Keyboard & Mouse (Not included with S9106AC-42D).
Summary of Contents for S9106AC-2IF
Page 6: ...2 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 24: ...20 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 42: ...38 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 56: ...52 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...