Keysight N5221A/22A Service Guide 7-41
Repair and Replacement Procedures
Removing and Replacing the A29–A32 Test Port Couplers
Removing and Replacing the A29–A32 Test Port Couplers
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— 1 inch open-end torque wrench (torque to 72 in-lb)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the front panel assembly. Refer to
Front Panel Assembly” on page 7-8
.
3.
Position the analyzer bottom side up.
4.
On 4-port models, it is necessary to remove the couplers in pairs: ports
1/3 and 2/4.
5.
Disconnect two semirigid cables (item
①
) from each coupler to be
removed.
6.
Disconnect the wire harness (item
➁
) from the corresponding front panel
LED board and place it out of the way.
7.
Remove the coupler nut (item
③
) from each coupler to be removed.
8.
Move the disconnected semirigid cables out of the way and remove the
coupler(s) from the analyzer. On 4-port models, separate the coupler pair.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Adhere a new gap pad (4-port) or coupler bumper (2-port) (item
④
) to the
new coupler in the same location as on the old one. Replace the vibration
mount (item
⑤
) if necessary. Refer to
Miscellaneous Parts” on page 6-98
for replacement part numbers.
Torque all connectors to 10 in-lbs. Torque coupler nuts to 72 in-lbs.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove assemblies but do not
over-bend them.
Summary of Contents for N5221A
Page 9: ...Contents Keysight N5221A 22A Service Guide 10 ...
Page 10: ...11 Keysight N5221A 22A Service Guide Contents ...
Page 156: ...5 32 Keysight N5221A 22A Service Guide Theory of Operation Power Supply Group Operation 5 ...
Page 264: ...6 108 Keysight N5221A 22A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...