![Kemppi X8 MIG Operating Manual Download Page 53](http://html1.mh-extra.com/html/kemppi/x8-mig/x8-mig_operating-manual_663370053.webp)
X8 MIG WELDER
2.3 Installation
11.
Connect the welding current cable to the plus (
+
) side connector (1) on the power source.
The interconnection cable crosses from the wire feeder to the power source connector diagonally.
Note:
If two wire feeders are connected to a power source, connect the interconnection cable upright:
from the wire feeder on the left to the connector (1) on the left.
12.
Connect the earth return cable to the minus (
-
) side connector (2).
13.
Connect the measurement cable to the measurement cable connector (4).
14.
Connect the control cable to the control cable connector (3) on the same side as the measurement
cable.
15.
If the water cooler is present, use the red connector (5) for the hose that goes to the cooler.
16.
If the water cooler is present, use the blue connector (6) for the hose that comes from the cooler.
17.
If you need shielding gas, connect the shielding gas hose to the gas cylinder.
The power source can be connected to two wire feeders at the same time.
Caution:
Ensure that you have connected and tightened all the cables properly.
2.3.4.2 Cabling diagram
Connect the interconnection cables to power source and wire feeder. The figure below shows the cables with
colors to facilitate the identification.
OPERATING MANUAL | EN
53
©
KEMPPI | 2018-09-28