Command Reference B-7
Note that parameters for a given source function and range may be sent in
any order; however, once one :CAL:PROT:SOUR command executes, the
other three must also be executed, or an error number -200, “Execution er-
ror” will occur when the :CAL:PROT:SAVE command is processed at the
end of the calibration procedure.
Because the source is calibrated for both positive and negative values, two
zero calibration points are required. The Model 2430 automatically uses the
appropriate zero parameter based on whether the source polarity is positive
or negative.
Example
:CAL:PROT:SOUR 2
Calibrate 2V source range.
Table B-3
Recommended:CALibration:PROTected:SOURce parameter ranges
Source
range
First parameter
(negative full scale)
Second parameter
(negative zero)
Third parameter
(positive full scale)
Fourth parameter
(positive zero)
0.2V
2V
20V
100V
10
μ
A
100
μ
A
1mA
10mA
100mA
1A
3A
-0.18 to -0.22
-1.8 to -2.2
-18 to -22
-90 to -110
-9E-6 to -11E-6
-90E-6 to -110E-6
-0.9E-3 to -1.1E-3
-9E-3 to -11E-3
-90E-3 to -110E-3
-0.9 to -1.1
-2.7 to -3.15
-0.002 to +0.002
-0.02 to +0.02
-0.2 to +0.2
-1 to +1
-1E-7 to +1E-7
-1E-6 to +1E-6
-1E-5 to +1E-5
-1E-4 to +1E-4
-1E-3 to +1E-3
-1E-2 to +1E-2
-3E-2 to +3E-2
+0.18 to +0.22
+1.8 to +2.2
+18 to +22
+90 to +110
+9E-6 to +11E-6
+90E-6 to +110E-6
+0.9E-3 to +1.1E-3
+9E-3 to +11E-3
+90E-3 to +110E-3
+0.9 to +1.1
+2.7 to +3.15
-0.002 to +0.002
-0.02 to +0.02
-0.2 to +0.2
-1 to +1
-1E-7 to +1E-7
-1E-6 to +1E-6
-1E-5 to +1E-5
-1E-4 to +1E-4
-1E-3 to +1E-3
-1E-2 to +1E-2
-3E-2 to +3E-2
Note: Actual allowable parameter ranges are ±50% of full range for zero parameters, 75% of full scale to 150% of full
scale for full-range parameters, but ranges listed above should be observed for optimum calibration.
Summary of Contents for SourceMeter 2430
Page 3: ...TAIWAN 1FL 85 Po Ai Street Hsinchu Taiwan R O C 886 3 572 9077 Fax 886 3 572 9031 ...
Page 6: ...Other brand names are trademarks or registered trademarks of their respective holders ...
Page 16: ......
Page 17: ...1 Performance Verification ...
Page 33: ...2 Calibration ...
Page 56: ...2 24 Calibration ...
Page 57: ...3 Routine Maintenance ...
Page 60: ...3 4 Routine Maintenance ...
Page 61: ...4 Troubleshooting ...
Page 75: ...5 Disassembly ...
Page 82: ...5 8 Disassembly ...
Page 83: ...6 Replaceable Parts ...
Page 104: ...6 22 Replaceable Parts ...
Page 105: ...A Specifications Section A pgs 1 5 qxd 11 7 2005 1 35 PM Page 1 ...
Page 116: ...A 12 Specifications ...
Page 117: ...B Command Reference ...
Page 128: ...B 12 Command Reference ...
Page 129: ...C Calibration Programs ...
Page 140: ......