ASSEMBLY STEPS

Please see illustrations at the end of the manual for further assembly instructions.

Assembly of spring:

p. 22 - 23

1. Place the 

 rst round plate between the spring.

2.  Turn the round plate towards the bottom of the spring.
3.  Place the black distance cube in front of the round plate, at the bottom between the spring and screw down the 

round plate until the black distance cube is blocked.

4.  Assemble the spring onto the anchor by using hardware set nr. 5. Tighten the 3 bolts by hand only.
5.  Click the round plate onto the spring by blocking the anchor (for example: with your feet) and turning the spring 

when holding it at the top. You’ll hear a small click when the round plate clicks into position.

6.  Screw on the bolts with the ratchet spanner.
7.  Place the second round plate between the spring.
8.  Turn the round plate towards the top of the spring.
9.  Place the black distance cube in front of the round plate, at the top between the spring and screw down the round 

plate untill the black distance cube is blocked.

10. Assemble the U-connection onto the spring by using hardware set nr. 5. Tighten the 3 bolts by hand only.
11. Click the round plate onto the spring by blocking the anchor (for example: with your feet) and turning the U-con-

nection. You’ll hear a small click when the round plate clicks into position.

12. Screw on the bolts with the ratchet spanner.

IIa  Assembly of spring and 

 at anchor:

p. 24

1.  Find a suitable location to install the spring animal. See FIG II. After installation the concrete foundation will need 

to be covered with a shock absorbing surface. The use of rubber tiles is recommended.

2.  Place the concrete anchor horizontally, using the spirit level, at the desired location and mark the holes.
3.  Drill the 4 holes of 90 mm deep.
4.  Remove the dust out of the drilled holes.
5.  Put the 4 wedge anchors in the holes.
6.  Screw on the nuts of the 4 wedge anchors with the ratchet spanner.

IIb  Assembly of spring and concrete anchor:

p. 25

1.  Find a suitable location to install the spring animal. Do not dig holes in loose soil or sand. The soil should be stable 

and compacted to provide proper support. See FIG II.

2.  Dig a hole for the anchor of the metallic spring pedestal. The hole needs to be 700 mm wide at the bottom and 

400 mm deep.

3.  Flatten the bottom of the hole and stamp with your feet. Place the metallic spring pedestal straight up in the hole. 

The best way is to use a spirit level. You can 

 x this position by putting a heavy stone or brick on the lower plate.

4.  Mix enough concrete to 

 ll the hole. Be careful to follow the manufacturers instructions. Pour concrete into the 

hole. Be careful to keep the spring and upper side top plate free of concrete. Make sure the spring is straight using 
a spirit level.

5.  Allow concrete to set overnight before going to step 6.
6.  Cover the visible concrete with soil so that the complete ground level is 

 at again. Make sure the ground is 

covered in a suitable way (eg. rubber tiles, bark, wood chips,...).

III  Assembly of the spring toy:

p. 26 - 27

1. Attach the seating to the suspension frame with hardware set nr. 1.
2.  Mount the side panels together with the wings to the suspension frame, with the handgrip and footrest mounted 

in between. Use the appropriate hardware sets as indicated on the drawing.

3.  Mount the assembled spring toy on the assembled spring by sliding the central protrusions of the suspension 

frame in the U-connection. Use the bolts from hardware set nr. 4 to fasten the complete spring toy.

Remark:

 The soil under the spring animal requires an adjusted surface that is shock absorbing!

assembly steps

Summary of Contents for Royal-duck

Page 1: ...z o o ul M Konopnickiej 6 00 491 Warszawa POLAND Instructions for use spring toy in HDPE royal duck Gebruiksaanwijzing veerspeeltuig in HDPE royal eend Mode d emploi jeu ressort en PEHD royal canard G...

Page 2: ...1000 mm around the toy must be guaranteed See FIG II 7 There is a compulsory free space for the user with a radius of 1000 mm and a height of 1500 mm 8 The falling space equals the surface of the impa...

Page 3: ...sorbing surface The use of rubber tiles is recommended 2 Place the concrete anchor horizontally using the spirit level at the desired location and mark the holes 3 Drill the 4 holes of 90 mm deep 4 Re...

Page 4: ...het speeltuig moet gegaran deerd worden Zie FIG II 7 Er is een vrije ruimte verplicht voor de gebruiker met een radius van 1000 mm en een hoogte van 1500 mm 8 De valruimte is gelijk aan de oppervlakt...

Page 5: ...mm diep 4 Verwijder resterend afval en stof uit de geboorde gaten 5 Plaats de 4 slagankers door de betonverankering in de gaten 6 Draai de moeren van de 4 slagankers aan met de ratelsleutel IIb Plaats...

Page 6: ...ns obstacles de 1000 mm autour du jouet Veuillez voir FIG II 7 Il y a une espace libre imperative pour l utilisateur avec un rayon de 1000 mm et une hauteur de 1500 mm 8 La zone de chute gale la surfa...

Page 7: ...izontal et dans la position d sir e Indiquez les trous 3 Perforez les 4 trous avec une profondeur de 90 mm 4 Enlevez la poussi re restante des trous perfor s 5 Placez les 4 douilles pour sol de b ton...

Page 8: ...ren Sie auf fehlende Unterteile Kontrollieren Sie dass die Sicherheitszone evakuiert ist Wirkungskontrolle 1 bis 3 Monaten Kontrollieren Sie die Stabilit t der Konstruktion Kontrollieren Sie auf au er...

Page 9: ...Fall schutzmatten ist hier an zu raten 2 Setzen Sie die Verankerung horizontal in die gew nschte Position und markieren Sie die L cher 3 Bohren Sie die 4 L cher 90 mm tief 4 Reinigen Sie das Loch von...

Page 10: ...smo ubicaci n en la costa contaminaci n del aire antig edad del equipo La frecuencia de los controles de inspecci n se debe aumentar de acuerdo a la ocurrencia de estos factores Inspecci n visual ruti...

Page 11: ...rior y girando la conexi n en U Se oir un peque o click cuando el plato redondo llegue a su posici n 12 Atornille los pernos con la llave de carraca IIa Montaje del muelle y anclaje plano p 24 1 Busqu...

Page 12: ...E La frequenza delle ispezioni e della manutenzione dipende del materiale utilizzato per l attrezzatura o di altri fattori p e uso intensivo livello di vandalismo ubicazione litorale inquinamento atmo...

Page 13: ...Inserire le 4 ancore cuneo nei fori 6 Vite I dadi sui 4 ancore cuneo con la chiave a cricchetto IIb Montaggio della molla ed ancoraggio cemento p 25 1 Scegliere un luogo adatto a installare il gioco s...

Page 14: ...konstrukcji pod k tem obecno ci rdzy i korozji Nale y sprawdzi zu ycie ka dej cz ci i w razie potrzeby wymieni na now 15 Instructions for use M174 001 03 spring toys royal _duck MONTA KROK PO KROKU W...

Reviews: