Maintenance intervals
C o m p o n e n t /
wearing part
Cleaning/care
Replacement
Tubes,
CPI-
equipped units
Tubes after ap-
prox. 200 operat-
ing hours
Tube opera-
tion:
•
Set level I:
after 1200
operating
hours
Acrylic panes
When necessary
After approx.
3000 hours
Ropes of the
canopy drive
Check and grease
after 500 - 600
hours
Replace
all
ropes
after
3000 hours.
Air hoses
Check after 500
- 600 hours.
When
necessary
Air-
conditioning
unit
Clean the heat
exchangers
after 500 - 600
hours and check
the condensate
pump.
When
necessary
LOCKING THE CANOPY IN PLACE
To
facilitate
many
maintenance and service
procedures, the canopy can
be locked in place (fi xed) in
its upper position. Turn the
lever on the left-hand side to
the left. When the canopy is
then lifted, it will be locked in place. You can unblock
it by turning the lever to the right. After the screws on
the right-hand and left-hand side have been removed,
the bed pane can be attached to the canopy.
Acrylic panes
CANOPY PANE AND SIDE PANE
The following table describes how to dismantle the
acrylic panes.
Procedure
Fig.
1
Lock the canopy in place.
2
Remove the screws and fold the can-
opy pane and / or the side pane down.
31.1
31.2
3
If necessary, the pane can be re-
moved from the hinge profi le when it
is in its lowest position.
4
The assembly is carried out in reverse
order. Make sure that the frame is
correctly positioned in the hinge profi le.
5
When closing the canopy pane, ensure
that all air nozzles exactly match their
counterparts. If not, carefully push
the nozzles concerned in their correct
positions.
6
Unblock the canopy.
O p e r a t i n g I n s t r u c t i o n s
|
mon amie
30