Ka
ysun Amaz
on Unit
ario T
op Dischar
ge Engineering Da
ta Book
Amazon Unitario Top Discharge
178
12 Appendix to Part 3 – System Commissioning Report
A total of up to 5 report sheets should be completed for each system:
One Sheet A, one Sheet B and one Sheet C per system.
One Sheet D and one Sheet E per outdoor unit.