![JUKI JX-100 Operation Manual Download Page 28](http://html1.mh-extra.com/html/juki/jx-100/jx-100_operation-manual_2029438028.webp)
Operation manual
Ⅰ
2
−
18
Step 9 Perform PWB production.
Enter the desired value in the “Planed No. of PWBs” field on the “Prod Control” screen,
and then press the <START> switch.
PWB production starts. (Refer to Section 3.2.2 “Production condition screen” of the
“Operation Manual II” for details of the production screen.)
When you press the <START> switch, the machine starts operating.
To avoid risk of injury, never put your hand or head inside the
machine.
①
Display the Production screen.
②
Start production.
③
PWB is loaded.
Enter a value in the
“Planned No. of PWBs” field.
<Operation panel>
Press the <START> switch.
PWB production starts.
When the number of produced PWBs
reaches the specified value or when you
press the <STOP> switch, the current
PWB production finishes.
WARNING
Conveyor LED
When the LED is ON, it is available to
load/unload a PWB.