![JUKI JX-100 Operation Manual Download Page 19](http://html1.mh-extra.com/html/juki/jx-100/jx-100_operation-manual_2029438019.webp)
Operation manual
Ⅰ
2
−
9
< Procedure 4> Adjust the pusher X and the pusher Y.
①
Set the PWB on the carrying-in side and make sure that the PWB can flow smoothly
continuously.
②
The Transport control screen is displayed.
1. Select [PWB transport (Shape
clamp)].
Select [PWB ejection] and press
[EXEC]. Then, the PWB is carried out.
2. Press [EXEC]. The board is
loaded and fixed.
Select [PWB Conveyor] on the Quick
setup screen.