Installation Checklist
Ventilation System
Total floor area of dwelling?
Total installed equivalent area of background ventilators in dwelling?
Have all background ventilators been left in the open position?
Is the installation complete with no obvious defects present?
Has all ductwork been effectively insulated where installed in unheated spaces?
Have appropriate air terminal devices been installed to allow system balance?
Are the correct number and size of background ventilators provided that satisfy
TGD F?
Condensate connection is complete and drains to an appropriate location?
Does the total installed equivalent ventilator area meet the requirements given in
Section 1.2 of TGD F?
Have the correct number and location of extract fans/terminals been installed
that satisfy relevant Table of Tables 1, 2 and 3 of TGD F?
Do all internal doors have sufficient undercut to allow air transfer between rooms
(i.e. 10 mm over and above final floor finish)?
Has all protection/packaging been removed (including background ventilators)
such that system is fully functional?
For ducted systems, has the ductwork installation been installed in such a manner
that air resistance and leakage is kept to a minimum?
Has the entire system been installed such that there is sufficient access for routine
maintenance and repair/replacement of components?
Upon initial start-up, was any abnormal sound or vibration experienced, or
unusual smells detected?
Summary of Contents for HHH-AEHP-00001
Page 32: ...32 www jouleuk co uk www joule ie Modul AIR Concrete Block Wall Build up 1 3 4 6 8 5 2 7...
Page 36: ...36 www jouleuk co uk www joule ie Modul AIR Timber Stud Build up 1 4 8 7 2 5 6 3...
Page 71: ...71 Modul AIR Exhaust Air Heat Pump Installation Guide Modul AIR Unit Menu Overview...
Page 72: ...72 www jouleuk co uk www joule ie...
Page 115: ...115 Modul AIR Exhaust Air Heat Pump Installation Guide...