46
www.jouleuk.co.uk | www.joule.ie
Connection Points
Primary Pipework
The external connection points to the Green Comfort are detailed
below:
•
Ventilation Fresh Air intake through the top 150mm duct
connection
•
Ventilation System Fresh Air supply through the bottom 150mm
duct connection
•
Flow and return piping connection for heating water
•
Flow piping connection from the Modul-AIR unit.
•
UTP data lead connection to be used to link with the Modul-AIR
unit.
•
Mains electrical connection through supplied fly lead.
•
The flow and return connections on the underside of the unit are 15mm compression.
•
The Green Comfort unit can be piped to in both rigid and flexible pipe, although it is recommended
to pipe it rigidly.
•
Isolation valves must be installed directly below the unit to allow for maintenance and/or repair of the
Green Comfort unit.
•
15mm compression connections are supplied with the Green Comfort unit for connecting to the
copper tails on the base of the unit.
Summary of Contents for HHH-AEHP-00001
Page 32: ...32 www jouleuk co uk www joule ie Modul AIR Concrete Block Wall Build up 1 3 4 6 8 5 2 7...
Page 36: ...36 www jouleuk co uk www joule ie Modul AIR Timber Stud Build up 1 4 8 7 2 5 6 3...
Page 71: ...71 Modul AIR Exhaust Air Heat Pump Installation Guide Modul AIR Unit Menu Overview...
Page 72: ...72 www jouleuk co uk www joule ie...
Page 115: ...115 Modul AIR Exhaust Air Heat Pump Installation Guide...