Use a lifting tool if moving the Modul-AIR upstairs.
Transport & Handling
Handling Instructions
•
Care must be taken when transporting, storing and
installing the Heat Pump.
•
The Modul-AIR unit is delivered securely packaged
in a polystyrene sandwich. Care should be taken
when transporting the Heat Pump ensuring that
the unit is not damaged by impact
•
The Heat Pump must remain in the upright position
during transport.
•
Do not remove the protective packaging until the
Heat Pump unit has reached its final location. This
will help protect the Heat Pump from damage.
•
For transport, e.g. via a stairs, the Heat Pump may
be tilted for a maximum of 15 minutes up to a
maximum angle of 45 degrees.
•
The Heat Pump can weigh up to 60kg. At least two
people are required to lift the unit at all times .
•
The Heat Pump must be stored in a dry area
and always stored upright on a level base. The
temperature in the storage room should be
between 5°C and 50°C. The humidity may be a
maximum of 85%, non-condensing
•
The unit must never be dropped during storage or
handling
•
The installation area should be free from frost.
•
The Modul-AIR unit must only be installed on a
plumb level wall with the required load bearing
capability.
•
Installation, servicing, maintenance and repair
must be carried out by a competent person.
Summary of Contents for HHH-AEHP-00001
Page 32: ...32 www jouleuk co uk www joule ie Modul AIR Concrete Block Wall Build up 1 3 4 6 8 5 2 7...
Page 36: ...36 www jouleuk co uk www joule ie Modul AIR Timber Stud Build up 1 4 8 7 2 5 6 3...
Page 71: ...71 Modul AIR Exhaust Air Heat Pump Installation Guide Modul AIR Unit Menu Overview...
Page 72: ...72 www jouleuk co uk www joule ie...
Page 115: ...115 Modul AIR Exhaust Air Heat Pump Installation Guide...