- 7 -
4. TOOLS REQUIRED FOR INSTALLATION
ROTARY HAMMER DRILL
3/4” CONCRETE DRILL BIT
1/2” CONCRETE DRILL BIT
4’ LEVEL
HEIGHT GUAGE
LASER LEVEL
HAMMER (for anchor installation)
PRY BAR (for shim installation)
CHALK LINE (lift location)
TAPE MEASURE
ELECTRICAL TAPE
STEP LADDER (adjusting cables and/or safety ladder in posts)
SIDE CUTTERS (for cutting shipping straps)
4 WORK STANDS (set up)
STANDARD SOCKETS AND WRENCHES
ALLEN KEY SET
SCREWDRIVER SET
FLOOR JACK OR ENGINE HOIST
BOX CUTTER / SNIPS (to remove packaging)
RUBBER OR PLASTIC MALLET
5. PACKAGING CONTENTS
The lift is packaged to protect it from damage during shipping. The two deck assemblies and
cross-beams are packaged together with the accessory boxes strapped to them.
Main Components:
1 - Left Side Deck Assembly (complete with hydraulic cylinder)
1 - Right Side Deck Assembly
1 - Front Cross-member Assembly (with air cylinder release locks)
1 - Rear Cross-member Assembly (with air cylinder release locks)
1 - Power Pack
2 - Ramps
1 - Accessory Box
Summary of Contents for EELR369A
Page 4: ... 4 1 2 SAFETY WARNING LABELS FOR 4 POST SURFACE MOUNTED ROLL ON LIFTS SAVE THESE INSTRUCTIONS ...
Page 8: ... 8 6 ALIGNMENT LAYOUT Aligner mount holes Figure 2 ...
Page 20: ... 20 Figure 18 ...
Page 26: ... 26 10 PARTS LIST 10 1 LIFT ASSEMBLY Figure 24 ...
Page 38: ... 38 Jack Beam Installation Operation and Maintenance Manual Parts Breakdown ...
Page 41: ... 41 LAYOUT VIEW Figure 1 ...