- 11 -
7.2 IDENTIFICATION OF MAIN LIFT COMPONENTS
Identify and unpack major lift components (cables, columns, cross beams) and place them
where they belong (front left, front right etc.) See
Figure 4
.
Place components in their approximate locations. Do not unwind cables at this point.
Leave cables coiled, close to their respective towers.
Place runways (decks) about 40” apart and about 3 ft behind line “A”
Figure 4
POWER PACK MOUNT
FRONT LEFT TOWER
FRONT RIGHT TOWER
REAR TOWERS
FRONT & REAR CROSS BEAM
Summary of Contents for EELR369A
Page 4: ... 4 1 2 SAFETY WARNING LABELS FOR 4 POST SURFACE MOUNTED ROLL ON LIFTS SAVE THESE INSTRUCTIONS ...
Page 8: ... 8 6 ALIGNMENT LAYOUT Aligner mount holes Figure 2 ...
Page 20: ... 20 Figure 18 ...
Page 26: ... 26 10 PARTS LIST 10 1 LIFT ASSEMBLY Figure 24 ...
Page 38: ... 38 Jack Beam Installation Operation and Maintenance Manual Parts Breakdown ...
Page 41: ... 41 LAYOUT VIEW Figure 1 ...