12
ASSEMBLY
Zero Clearance with
UK Front
Installation Instructions
Step 4.
At this point, slide the top bracket up until it is 1mm above the top
of the sub-frame, ensuring that the edge of the top slide bracket is hard up
against the front surface of the sub-frame.Check that the leftand right hand
fixed brackets are located centrally and that the top slidebrackets are 1mm
higher than the sub-frame and are parallel with the top edge of the sub-frame
Step 5.
At this stage, it is easier to fit
the gas burner into the firebox.
6. Fitting the UK front.
• Before offering up the UK front, ensure that the two lower slide boltsare pushed
fully to the centre of the fire so that they do not foul thesub-frame when offering
the UK front up to the sub-frame for fitting.If they have moved during transit then
slacken the M8x16mm screwsand slide the bolts towards the centre. Then re-
tighten them. Screwa grub screw just a couple of threads into the end of each
slide bolt.
• Now offer up the UK front so that it rests on the top brackets and itlocates
between the sub-frame. Insert an M8x16mm long screw intoeach of the top
holes of the UK front and screw them hand tight intothrough, into the top slide
brackets.
. . . continued
Summary of Contents for INTERNATIONAL GAS CONVECTOR BOX
Page 22: ...22 NOTES ...
Page 23: ...23 ...