9
ASSEMBLY
IGC Zero Clearance with
100mm Trim
Installation Instructions
1. Bolt gather onto the top of the IGC,
using the bolts provided
2. Slide 100mm trim over the existing
50mm flange of the IGC.
3. Assemble the Zero Clearance
casing:
- The casing comes in two pieces.
Unfold the side panels of the
large piece so that they sit at 90
degrees to the central panel. This
forms the back and sides of the
Zero Clearance casing.Stand this
upright to create the body of the
casing. Fold down the tabs around
the top of the back and sides.
- Fold the second piece according to
the perforations, creating a top and
front panel, and a front lip.
- Place the top/front panel over the
sides and back of the casing. Line
up the holes and attach,using self-
tapping screws or pop-rivets.
4. Lift Zero Clearance casing over the
IGC and gather and attach using
three screws on each side.
5. The IGC Zero Clearance casing
with 100mm trim is now complete.
Summary of Contents for INTERNATIONAL GAS CONVECTOR BOX
Page 22: ...22 NOTES ...
Page 23: ...23 ...